scroll down

Creating a versatile space for a leading global investment manager

  • Landlord
  • 21,500 sq ft
  • Hammersmith
Project Team

Peldon Rose are proud to deliver another project for a leading global investment manager at a prime office space in Hammersmith. The burgeoning relationship with the client began with a 2,700 sqft ready-to-work space. Working alongside the project management team at Workman Building Consultancy, CBRE and Hanover Green, Peldon Rose are now creating a versatile set of workspaces, designed to attract tenants at the forefront of innovation.

View gallery

At the heart of Hammersmith

Situated in Zone 2 to the west of the City, Hammersmith forms the gateway to London. There are strong road and rail links into central London, while the proximity to the M25 means the national motorway network is easily accessed. Positioned at a crossroads of four TfL underground lines, Hammersmith benefits from an abundance of retail, lifestyle and entertainment facilities making it an ideal home for London’s workforce.

The client challenged Peldon Rose to create a Cat A space on the fourth floor of this opportune location that would meet the demands of any future occupier. The brief was to push the boundaries set by existing workplace design in the area. This applied to everything from technical design, to integrating sustainability across the project.

View gallery

Creating solid M&E foundations, and a blank canvas

Across a linear, 20,000 sq. ft. floorplate, the project started with significant strip-out and internal demolition of the existing space. The removal of ineffective and worn mechanical and electrical works paved the way for replacement M&E using SmartSpace Software. This pioneering real-estate technology enables a constant monitoring of all associated M&E within the workplace. It offers both the tenant and landlord the ability to adapt building energy outputs via a mobile or online interface, and creates a safer, more energy efficient workplace to help lower running costs and the environmental impact of the space.

Crucially, the M&E was installed in a way that will allow future occupants maximum flexibility. Seamless partitions can be installed, while symmetrical installation allows for multiple tenant occupancy if required. The result is a structurally sound, blank canvas that can be tailored to the future needs of tenants equipped with LED lighting and efficient MEP services.

View gallery
View gallery
View gallery
View gallery

A design inspired by nearby landmarks

Starting from the warm welcome of the fully refurbished reception at the building’s main entrance, an equally receptive lobby and waiting area welcomes tenants and visitors to the fourth floor. Soft seating is set against a backdrop of industrial greens, inspired by nearby Hammersmith Bridge, this is paired with warm, golden lighting framed by biophilia to reflect the proximity to the Thames.

The industrial influence of the train tracks directly outside the building is mirrored internally. Across the floorplate concrete pillars stretch to exposed ceiling mechanics with mesh grids and green cable trays, maximising the ceiling height. Understanding the importance of providing an enjoyable tenant experience, fully refurbished toilet facilities have been installed with stone tiling, metallic greens, and oak doors, complementing the lobby’s ‘hotelification’ feel. This experience is enhanced with subtle metal signage and wayfinding throughout the space to assist with the user journey.

View gallery

A sustainable agenda from start, to finish

Creating an environmentally responsible workplace was one of the client’s key objectives. Of the 67 tonnes of waste generated from the initial strip out, 93% was recycled. Then, materials such as eco-backed flooring and SmartSpace technology work towards the aim of a BREEAM Excellent Rating for the whole building, which Peldon Rose are committed to achieving over subsequent floors where works are already underway.

Head of Landlord, Kevin Wither, said: “This project was a wonderful opportunity for our business to add value to our client in offering a fully refurbished, modernised office environment to a resurgent Hammersmith Market. We had the ability to fully influence the design, with key nods to the landmarks of the area while giving the client maximum flexibility to sub-divide the floorplates if required to suit specific tenant needs. I’m very proud of the team’s achievements with this project, paving the way for many further opportunities within the building complex.”

"Workman BC are delighted to have completed this quality CAT A refurbishment for the Client in partnership with Peldon Rose which successfully delivered BREEAM ‘Excellent’ and EPC ‘B’ ratings, and high-quality finishes throughout."

James Taylor, Partner at Workman
View gallery
View gallery
Contemporary lighting at Peldon Rose office

Start your workplace transformation today.

Your workplace holds enormous potential to improve your business performance. Get in touch today, and we will unlock that potential together.

Share this space:
Copy to clipboard Link copied to clipboard
Discuss a project: Leave your details
Call us: 020 8971 7777
Discuss a project: Leave your details
Call us: 020 8971 7777